Sales playbook Updated

Hiring window installers: crew or subs, the tryout, pay and lead‑safe work

The short answer

Hire window installers on proof, not talk. First decide between your own crew and subcontractors; the IRS sorts the facts that decide which one a worker really is into behavioral control, financial control and the type of relationship1. Then check license and insurance, call a homeowner and a dealer they've worked for, and pay for a tryout install on your product. If you'll work on homes built before 1978, plan on EPA lead-safe firm certification and trained renovators on every crew2. Give every crew the signed order and the render the homeowner approved.

Photo of a red brick bungalow with burgundy window frames
Render of the same brick bungalow with white colonial-grid windows in place of the burgundy frames
Render: white windows with colonial grids in place of the burgundy frames, same window layout. Drag to compare. Photo: M J Richardson, CC BY-SA 2.0 · render shared under the same license

Should you hire window installers as employees or use subcontractors?

You may end up with some of each, but decide which one runs your normal week. Your own crew gives you the schedule, the methods and the way the homeowner is treated. Subcontract crews let you add and drop capacity as sales move, and they bring their own truck and tools. Each costs you in a different place: payroll and idle days for a crew, less say over the work and more checking for subs.

Don't go by the word on the paperwork; look at how the work actually runs. The IRS groups the facts it looks at into three kinds: behavioral control, financial control and the type of relationship1. If you set a sub's hours, supply the tools and pay by the hour, ask your accountant whether you really have an employee. Your state may look at it differently, so settle it with an accountant or employment lawyer before anyone starts. This is general information, not tax or legal advice.

If you're a roofer or remodeler adding windows, the same choice comes up with a twist; see adding windows to a roofing business.

Your own crew or subcontractors: what changes

Who decides how and when the work is done

Your own crew
You: methods, hours and the order of jobs
Subcontract crew
Mostly the sub, inside what your agreement says

What a slow month costs

Your own crew
Payroll keeps running unless you cut hours
Subcontract crew
Little: you book fewer jobs

Truck, tools and disposal

Your own crew
Usually yours to buy and run
Subcontract crew
Usually theirs; put it in writing

Insurance to check

Your own crew
Your own policies; ask your agent what your crew needs
Subcontract crew
Their certificates, current and for this kind of work, checked every season

Training on your product

Your own crew
You train once and it stays in the company
Subcontract crew
You train each crew, and some install for other dealers too

Who the homeowner sees

Your own crew
Your shirts, your truck, your people
Subcontract crew
Their people under your name, so set rules for dress, talk and cleanup

Best when

Your own crew
Volume is steady and you want one standard
Subcontract crew
Volume swings, or you're new and can't carry payroll yet

What should you check before you hire a window installer?

Check what a careful homeowner will check, then what only you will notice. The FTC tells homeowners to consider only licensed and insured contractors, to check the license with their state or county, and to ask for proof of insurance3. When your sub is standing on their porch, your company's name is on the contract, so their paperwork is your paperwork.

For a benchmark, look at what one national brand asks of its subs. Renewal by Andersen says on its installer application that subcontract crews need $1 million per occurrence of general liability, $1 million of auto liability, workers' comp at the statutory limit, a Certified Lead Renovator certificate, their own truck, trailer and tools, at least three years of window and remodeling experience, and a crew of at least two4. Your own limits are a question for your insurance agent, but a list that specific is a good model for yours.

Your state may also have rules for the subcontract itself. California, for example, requires a licensed contractor to put its license number in its construction contracts and its subcontracts5. Ask your state's contractor board before you write your first one.

  • License: the right one for this work in your state and city, in the name of the person or company you're paying, and current.
  • Insurance: certificates sent by their agent, not a photo of a card, for liability and for workers' comp if they have their own workers. Put the end dates on your calendar. Ask your own agent what limits to require and whether to be listed on their policy.
  • Product experience: which brands and frame materials they've installed, and which methods: an insert into the old frame, or a full-frame tear-out to the rough opening. Ask how they'd do your typical house.
  • References from a homeowner and from a dealer they've installed for. The dealer will tell you about callbacks; the homeowner will tell you about cleanup.
  • Photos of their own past installs, inside and out, and the address of a recent one you can drive past.
  • Capacity: how many openings a day they do on your kind of job, how far out they're booked, and who else they install for.
  • Lead-safe paperwork if you work on homes built before 1978: a current renovator certificate for whoever leads the crew and, for a sub, their own firm certification. Both are explained further down.

Phone screen for an installer or a sub crew

Tell me about the last three jobs you did. What windows, what kind of house, insert or full-frame?

You pull the old window and the sill is soft. What do you do next, and who do you call?

Who's on your crew, and who's in charge on the job when you're not there?

Can your agent email me your insurance certificates this week?

Is your company EPA lead-safe certified, and who on your crew is a certified renovator? Send me both certificates with the insurance.

Who can I call? One homeowner and one dealer you've installed for.

A window you put in starts leaking a year later. What happens?

Listen for specifics: brands, methods, what went wrong and how they fixed it. A vague answer to the soft-sill question is the one to worry about.

How do you test a window installer before giving them jobs?

Pay for a tryout. Give a new installer or crew one real job, or a few openings on one, with your product, and be there for it. An interview tells you how someone talks about installing windows. A morning on a job tells you how they install them, and how they treat the house and the family in it.

Read the maker's installation instructions first so you know what you're watching for. They're specific. Ply Gem's guidance, for example, says not to install unless temperatures will stay above freezing for the next 24 hours so sealants can cure, and not to install onto wet or frosty surfaces6. The installer you want knows the instructions for your brand and follows them when nobody's checking.

Tryout scorecard

Arrival and setup

Good sign
On time, introduces themselves, puts down drop cloths, asks where to stage
Red flag
Walks in and starts pulling trim

Taking out the old window

Good sign
Removes stops and sashes without wrecking trim that's staying
Red flag
Splits casing that was supposed to be reused

Checking the opening

Good sign
Looks for rot and water damage, checks level, plumb and square, and tells you before covering anything
Red flag
Covers damage and moves on

Setting the window

Good sign
Shims and fastens where the instructions say, and checks that every sash opens and locks before insulating
Red flag
Skips the operation check, or fastens where the instructions don't allow

Insulating and sealing

Good sign
Uses the foam or insulation the maker calls for and seals the outside so water runs off
Red flag
Overfills with the wrong foam until the frame bows, or leaves gaps

Finish and cleanup

Good sign
Tight trim, neat caulk, the window labels kept for the homeowner, the floor vacuumed
Red flag
Dust, cut-offs and old caulk left behind

Talking to the homeowner

Good sign
Shows how each window opens, locks and gets cleaned
Red flag
Leaves without a word

How do window installers get paid?

Rates vary by market, crew and job, so this guide doesn't quote one; ask a few local crews and your supplier's rep what's normal where you work. What matters more than the rate is that both sides know exactly what it covers before the first job. How install cost goes into your price is in how to price window replacement jobs.

There are three common ways to pay, compared in the table below. Whichever you choose, put these in writing:

  • What's included: removal, hauling away the old windows, interior and exterior trim, caulk and cleanup.
  • What counts as extra, and who approves it on the job before the work is done.
  • When you pay: after you or the homeowner sign off the finished job, on a set schedule.
  • Callbacks: who goes back for a leak or a sticking sash, how fast, and whether that trip is paid.
  • Damage: who pays when a crew cracks a sill or scratches a floor.
  • Lead-safe jobs: whether the extra setup, containment and cleanup time on a pre-1978 house is paid as an add-on.
  • For employees, check the wage and overtime rules for your state with your accountant.

Three ways to pay an install crew

The opening

How it works
A set amount per window or door, with add-ons for extra work
Works well when
Your jobs are similar and you can price the extras up front
Watch for
Rushing to finish more openings. List the extras in writing: interior trim, exterior capping, mulled units, special shapes, second-floor ladder work, rot repair

The day or the hour

How it works
Wages for employees, or a day rate for some subs
Works well when
Jobs vary a lot, or the crew is still learning your product
Watch for
Slow days. Track openings per day so you can see them

The job

How it works
One agreed price per job, set before it starts
Works well when
Large or unusual jobs
Watch for
Arguments over what the price covered once the walls are open

Do window installers need a certification?

Three different things get called certification, and only one is optional. Licensing is the legal side, set by your state and sometimes your city or county, and it may cover the company, the installer or both; check with your state's contractor board before the first job. EPA lead-safe certification is required for covered work on homes built before 19782, and it has its own section below. Installer training certificates are voluntary.

One voluntary program is FGIA's InstallationMasters. FGIA says installers earn it with a two-day class and a written exam, and the certification lasts four years before an online recertification test7. Some window makers also train installers on their own products. Ask a candidate which courses they've finished and when, then confirm the certificate is current with the program. Ask your maker or distributor what training they offer, and whether their warranty sets any installation requirements.

Training doesn't replace the tryout, but use it in the sale once your installers have it. Homeowners worry about the work, not only the price: JLC reads "I want to think about it" as a sign the homeowner fears an unfair price, poor work or a weak product8. Who installs, and how they were trained, answers the second fear.

At the table, when they ask who's installing

Our own crew installs. [Name] runs it and has been putting in windows for [years]. They've done [training] on this product.

They'll protect your floors, take out one window at a time, and show you how each new one works before they leave. They install the frame color and grilles you picked here, from the order you sign.

If anything isn't right afterward, you call me, not them, and I send them back.

Only say what's true for your crew. If you use subs, say so, and say who stands behind the work.

What do EPA lead-safe rules mean for window installers?

Window replacement disturbs paint. Stops, sashes, sills and trim get cut, pried or scraped, and in older houses that paint can contain lead, a hazard for the family and for your crew. EPA's Renovation, Repair and Painting (RRP) Rule covers paid work that disturbs lead-based paint in homes and child-occupied facilities built before 1978: the firm has to be certified by EPA or an authorized state, use trained renovators and follow lead-safe work practices2. Window jobs don't slip under it as minor repairs; EPA counts replacing a window of any size as a renovation9.

Subcontracting doesn't hand the duty to the sub. EPA says a general contractor that subcontracts the whole job is still performing the renovation and must be a certified firm, and that a firm whose sub breaks the rule is responsible for the violation too10. The stakes are real: in 2025 EPA announced that Lowe's agreed to pay a $12.5 million civil penalty over alleged lead-safe violations in renovations done by its installers, and to run a company-wide program for qualifying the firms and installers it hires11.

Three habits keep a window company on the right side of it, and the table after them sums up what EPA says. Some states run their own programs, so check yours. This is general information, not legal advice: confirm the details on EPA's lead pages or with your state program, and with your lawyer.

  • Write the year the house was built on every measure sheet, so a pre-1978 job is flagged before it's priced and scheduled.
  • Put lead-safe duties in every subcontract: whose certificates, who hands over the pamphlet, who keeps the records, and what happens when a crew skips a step.
  • Price and schedule the extra setup, containment and cleanup time on covered jobs instead of hoping the crew absorbs it.

EPA's lead-safe rule for a window company: what EPA says and what to do

Your company

What EPA says
Firm certification lasts five years. Apply to renew more than 90 days before it expires, or it can lapse and stop you working until EPA approves a new one12
What to do
Put the expiry date on the office calendar, a year ahead

Subcontract crews

What EPA says
Both the company that contracts the job and the sub doing covered work must be certified firms10
What to do
Collect the sub's firm certificate as well as their renovators' cards, and file both with their insurance

The people on the job

What EPA says
A certified renovator takes an 8-hour initial course from an accredited trainer, then a refresher every five years, or every three if it has no hands-on part. Let it lapse and the 8-hour course starts over13
What to do
Name the certified renovator for each job in the job packet, and track every expiry date

The homeowner

What EPA says
Before the job, the owner gets EPA's Renovate Right pamphlet, with a signed acknowledgment or a certificate of mailing at least seven days ahead. If the owner doesn't live there, an adult occupant gets one too14
What to do
Make it a step in scheduling the install, and check EPA's timing rules for when it can be handed over

Records

What EPA says
The firm keeps the records that show it followed the rule for three years after the job. When several firms work on one project, one of them can keep the records15
What to do
Keep them in the job record with the photos, and agree in writing which firm keeps them

What should every install crew get before the job?

A complete job packet. When install day goes wrong, look first at the hand-off from sales: a note that stayed in the rep's head, a size that changed after the price, a color nobody wrote down. Good installers stay where the paperwork is clean.

Keep the packet in one place the whole crew can open on a phone. The tools for that, from scheduling to job photos, are in software for window and door businesses.

  • The signed order and the maker's order confirmation, checked against each other.
  • The final measure sheet, with the method for each opening: insert or full-frame.
  • Photos of every opening, inside and out, taken at the visit. How to photograph a house for a window quote covers the shots.
  • The render the homeowner approved, so the crew knows what the family expects to see.
  • Notes: parking, pets, alarm codes, which rooms to start in, anything found during the walk-through, and, for a pre-1978 house, that it's a lead-safe job and who the certified renovator is.
  • The homeowner's name and number, and who on your side they should call on the day.
Text message, the day before the installExample

Hi, it's your rep from the window company. The crew arrives tomorrow between 8 and 9. Here's the render of the look you picked, so you know what's coming: white frames with colonial grids.

Render of the same house with white colonial grids on the arched window and the porch windowRender

If you can, clear the sills and move anything fragile away from the windows tonight. The crew lead will walk through with you before they start.

Great, we'll be ready. Will they need to get into the upstairs bedrooms?

Yes, every room with a window on the order. They'll put down covers first and show you how each window works before they leave.

An example thread. No real customer.

Where the render fits for install crews

In the job packet. The render is what the homeowner said yes to: their own house or room with the frame color and grilles they picked. Put it in the job folder next to the order, so the crew lead knows what the family expects to see when the truck pulls away.

Use it twice before anything comes out of a wall. Text it to the homeowner the day before, so they remember what's coming. When the windows arrive, check the labels against the order and glance at the render, which catches the obvious mix-up, like white units on a job sold in black.

Keep the roles straight: the order is the spec, and the render is a preview of the look. Screen colors are close, not exact, and each window keeps its current style, so no crew should ever install from a render. If your installers also quote small jobs, they can make one at the door: one photo, the frame and color, and 30 seconds later the homeowner is looking at their own house.

Real before and after

Each pair is a real photo and a WindowRender render of that same photo. The caption says what the render changed.

Photo of a blue two-story colonial with white windows and white shutters
Render of the same blue colonial with black-frame windows
Render: black frames, same window styles, white shutters kept. Photo: Famartin, CC BY-SA 4.0 · render shared under the same license
Photo of a board-and-batten Craftsman-style house with an arched gable window and a covered porch
Render of the same house with black frames on the arched window and the porch window
Render: black frames on the arched gable window and the porch window, same window layouts. Photo: Robert Neustadter, CC BY-SA 4.0 · render shared under the same license
Photo of a kitchen with a large white-framed window over the counter
Render of the same kitchen with a black-framed window and the same view outside
Render: black frames, same sashes, same snowy view outside. Photo: Shixart1985, CC BY 2.0 · render shared under the same license

Questions

Should installers or sales reps measure the windows?
Whoever measures owns the mistakes, so decide on purpose. One way to split it: the rep takes sizes for the price, and an installer or a measure tech takes the final measurements before anything is ordered. The second visit costs a trip, but it catches errors before they become a custom window that doesn't fit. Tools that measure from photos are covered in measure windows from photos.
Can a window installer also be the salesperson?
In a small company, often, and homeowners like hearing from the person who'll do the work. The skills are different, though: running the visit and asking for the order have to be learned. The trade-offs are in hiring window sales reps.
Do I need a written agreement with a subcontract installer?
Yes. Put the scope, the pay and extras, the schedule, insurance, licensing, lead-safe duties, callbacks, damage and who talks to the homeowner about what in writing. Have a lawyer in your state review the template once, because your state may set rules for what it must include.
Do window installers need EPA lead certification?
For paid work on homes built before 1978, usually yes, and EPA counts replacing a window of any size as a renovation under its lead rule9. The company needs firm certification and the job needs certified renovators; when you subcontract, EPA says both your company and the sub must be certified firms10. The lead-safe section above has the details; check EPA's pages, your state's program and your lawyer.

Put the render in the next job packet

Render the look your customer picked from the photo you took at the visit, then send it to the crew and the homeowner. It takes 30 seconds.

First render free with no account, then 3 free renders. No credit card. Then $1 for your first month of Starter.

How it fits a window sale: replacement window visualizer

Sources

  1. 1. IRS: irs.gov/taxtopics/tc762 · seen October 23, 2026
  2. 2. U.S. Environmental Protection Agency: epa.gov/lead/lead-renovation-repair-and-painting-prog... · seen October 23, 2026
  3. 3. Federal Trade Commission: consumer.ftc.gov/articles/how-avoid-home-improvement-scam · seen October 23, 2026
  4. 4. Renewal by Andersen: assets.renewalbyandersen.com/forms/installers-application · the company's own claim · seen October 23, 2026
  5. 5. California Legislative Information: leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml · seen October 23, 2026
  6. 6. Ply Gem: plygem.com/windows/support · seen October 22, 2026
  7. 7. Fenestration and Glazing Industry Alliance: fgiaonline.org/education/professional-certification/installa... · seen October 23, 2026
  8. 8. JLC: jlconline.com/business/sales-marketing/i-object_o · seen October 22, 2026
  9. 9. U.S. Environmental Protection Agency: epa.gov/lead/please-provide-guidance-how-agency-will-... · seen October 23, 2026
  10. 10. U.S. Environmental Protection Agency: epa.gov/lead/frequent-questions-about-firm-certificat... · seen October 23, 2026
  11. 11. U.S. Environmental Protection Agency: epa.gov/newsreleases/lowes-home-centers-pay-125m-pena... · seen October 23, 2026
  12. 12. U.S. Environmental Protection Agency: epa.gov/lead/renovation-repair-and-painting-program-f... · seen October 23, 2026
  13. 13. U.S. Environmental Protection Agency: epa.gov/lead/renovation-repair-and-painting-program-r... · seen October 23, 2026
  14. 14. U.S. Environmental Protection Agency: epa.gov/system/files/documents/2026-05/508-small-enti... · seen October 23, 2026
  15. 15. U.S. Environmental Protection Agency: epa.gov/lead/frequent-questions-about-recordkeeping-r... · seen October 23, 2026

WindowRender is not affiliated with Renewal by Andersen, Ply Gem, FGIA or JLC. Details about other companies and studies come from the pages above as of the date shown and can change, so check with the source before you rely on them.